Two complete simple-cycle plants built around the SGT-A65 aeroderivative (Industrial Trent lineage): cold start to full power in about five minutes, high-cycling duty with no start lock-out, and engine change-out in under 24 hours.
120 MWcapacity
Two complete 60 MW plantsconfiguration
Available nowdelivery window
Availablestatus
Fig. 02 — Aeroderivative gas turbine, indicative linework. Unit-specific photography is released under NDA.
The offering
The offering comprises two complete, documented plants. Everything from inlet filtration to medium-voltage switchgear is in scope, together with OEM as-builts and the full maintenance record through storage. The aeroderivative architecture gives five-minute cold starts and true daily-cycling duty, and the modular design erects in weeks at the receiving site. De-rig, packing, and transport anywhere in the lower 48 are included in the transaction.
≈42% simple-cycle efficiency at ISO
Full balance of plant: inlet and filtration, exhaust with SCR, controls, MV electrical package
De-rig, packing, and transport to any lower-48 site included
Complete OEM as-built drawings and full service history
≈5 minutes, cold to full power; designed for daily cycling
Scope
Turbines plus balance-of-plant, switchgear, breakers, plant controls; documentation package
Serviceability
Modular erection in weeks; full engine change-out < 24 hours
Delivery basis
Delivered to buyer's site, continental U.S.; offload and reassembly by buyer (reassembly available under separate contract)
Released in stages under NDA: complete specifications, diligence detail, and pricing follow NDA execution; serial numbers, nameplate photography, unit location, and ownership and lien position follow an executed LOI, proof of funds, and a refundable deposit. The summary above is indicative, derived from seller documentation, subject to verification in diligence and to prior sale. Nothing on this page is an offer capable of acceptance.