Equipment index — August 2026 Serials, locations & pricing released under NDA ≈1.1 GW across 9 packages
Halyard Power Assets.
← Index of offerings
Offering № 05 — August 2026

Solar Titan 130 — Zero-Hour Set

Four mobile Titan 130 units in zero-hour refurbishment with operational testing before shipment, delivering staged through 2027 with a full industry-standard warranty.

≈62 MWcapacity
Four mobile unitsconfiguration
Q2 – Q4 2027delivery window
In refurbishmentstatus
Trailer-mounted mobile package
Fig. 05 — Titan 130-class mobile units staged for transport. Representative of class; unit-specific photography under NDA.

The offering

For 2027 requirements, this set pairs the Titan 130 platform's field record with zero-hour condition: full refurbishment, operational testing before shipment, and a 12-month-from-COD warranty. Four units at 15.4 MW each, mobile by design — deployable as one block or split across sites.

  • 15.4 MW ISO each · trailer-mounted mobile configuration
  • Zero-hour refurbishment with pre-shipment operational test
  • Warranty: 12 months from COD or 18 months from delivery
  • Deployment windows Q2 – Q4 2027

Quick reference

PlatformSolar Turbines Titan 130 SoLoNOx, single-shaft industrial
UnitsFour, mobile trailer-mounted
Output15.4 MW ISO each at 60 Hz · ≈62 MW combined
ConditionZero-hour refurbishment in progress; tested before shipment
FuelNatural gas · SoLoNOx DLE
Warranty12 months from COD / 18 months from delivery
Delivery windowQ2 – Q4 2027, staged
Delivery basisFrom U.S. port of entry; transport and trailer permitting by buyer
Released in stages under NDA: complete specifications, diligence detail, and pricing follow NDA execution; serial numbers, nameplate photography, unit location, and ownership and lien position follow an executed LOI, proof of funds, and a refundable deposit. The summary above is indicative, derived from seller documentation, subject to verification in diligence and to prior sale. Nothing on this page is an offer capable of acceptance.